MS PET HOUSE Padded Dog Training Leash 10 Ft Long Lead for Dogs 1" Wide by 10 Ft Long Blue 305 cm Dog Strap Leash(Blue, Gold)
MS PET HOUSE

MS PET HOUSE Padded Dog Training Leash 10 Ft Long Lead for Dogs 1" Wide by 10 Ft Long Blue 305 cm Dog Strap Leash(Blue, Gold)

Deal score 100/100· Excellent deal79% off MRP· Near 90-day low

Based on current discount vs MRP and price history — not product quality reviews.

BEST PRICE
Flipkart
In stock
₹212
79% off
₹999
Updated 157d ago
Buy on Flipkart

Shipping & returns (retailer)

Fulfilled by Amazon India or Flipkart when you buy on their site. Details below match our structured data for each offer.

  • Flipkart
    Delivery to India: 2–7 business days to IndiaTypical return window: up to 7 days (category-specific rules on retailer site). Return shipping usually paid by customer unless stated otherwise on checkout.
    Flipkart return policy
All-time low: ₹212 (last 90 days)

Kaisa community rating

No community ratings yet — be the first.

90-day price history

View how prices changed over the last 90 days on Amazon and Flipkart.

Loading price chart…

About this product

Introducing our premium pet leash, designed for comfort, safety, and style. Crafted from durable, high-quality nylon, this leash offers strength and flexibility for both small and large dogs. The padded handle ensures a comfortable grip, reducing strain during long walks, while the sturdy metal clasp provides a secure connection to your pet's collar or harness. • Material: Nylon, Iron • Length: 305 cm • Weight: 100 g • Color: Blue, Gold

Specifications

General

Key highlights
Material: Nylon, Iron · Length: 305 cm · Weight: 100 g · Color: Blue, Gold
Additional details
Material: Nylon, Iron | Length: 305 cm | Weight: 100 g | Color: Blue, Gold
Brand
MS PET HOUSE
Brand Color
Blue
Color
Blue, Gold
Material
Nylon, Iron
Model Name
Padded Dog Training Leash 10 Ft Long Lead for Dogs 1" Wide by 10 Ft Long Blue
Model Number
Padded Dog Leash 10 Ft -Blue
Multiple Leash
No
Net Quantity
1 Leash
Number of Leash
1
Pet Type
Dog
Product Id
PLNGB9YHEHCRM4Z8
Retractable
No
Suitable For
Adult, Young
Type
Strap

Additional Features

Key Features
Durable construction, Comfortable padded handle, Reflective stitching for safety, Lightweight design, Secure metal clasp, Adjustable length options
Other Features
COMFORT PADDED HANDLES: Easy to grip padded handle is comfortable on your hand. Just enjoy the feeling walks with your dog and protect your hand from rope burn

Dimensions

Length
305 cm
Weight
100 g
Other Dimensions
DIMENSIONS - This dog leash measures 1 inch wide by 10 feet long.

In the Box

Sales Package
1

Related products

More in this category and similar picks with live prices — compare before you buy.

Dog Belt Combo of Rope with Choke Collar 0.75inch Length Dog Collar & Leash for Your Dog (Not for Puppies) Colour - Black
Smart Doggie

Dog Belt Combo of Rope with Choke Collar 0.75inch Length Dog Collar & Leash for Your Dog (Not for Puppies) Colour - Black

₹249
amazon
Updated 3614h ago
Skora Turwoise Nylon Rope for Medium Dog (152cm x 15mm)
17% OFF
Deal 65
Pet Guard

Skora Turwoise Nylon Rope for Medium Dog (152cm x 15mm)

₹266
₹320
amazon
Updated 3614h ago
YOUSTYLO Heavy Duty Nylon Dog Leash | Anti Slip Padded Handle Long Dog Leash | Highly Reflective Leash for Dogs | Dog Rope for Medium & Large Dogs | Dog Training Leash | (5 Feet Long, Blue)
Youstylo

YOUSTYLO Heavy Duty Nylon Dog Leash | Anti Slip Padded Handle Long Dog Leash | Highly Reflective Leash for Dogs | Dog Rope for Medium & Large Dogs | Dog Training Leash | (5 Feet Long, Blue)

₹349
amazon
Updated 3614h ago
Flexi New Classic Retractable 26' Dog Leash (Tape), Large, Black
FLEXI

Flexi New Classic Retractable 26' Dog Leash (Tape), Large, Black

₹4,552
amazon
Updated 3614h ago
Dog Trust Training Brass Choke Chain Collar, Brass Heavy Duty Diamond Cut Gold Dog Choke Chain Training Dog Collar for Cats, Puppies and All Breed Dogs (3 mm, 24 Inch-Medium)
FONDLE

Dog Trust Training Brass Choke Chain Collar, Brass Heavy Duty Diamond Cut Gold Dog Choke Chain Training Dog Collar for Cats, Puppies and All Breed Dogs (3 mm, 24 Inch-Medium)

₹484
amazon
Updated 3614h ago
RvPaws Light Weight Metal Long Chain for Small Dogs, Cats Or Small Animals Silver Chain with Hook (152CM) Chain Size -No 14
S.Blaze

RvPaws Light Weight Metal Long Chain for Small Dogs, Cats Or Small Animals Silver Chain with Hook (152CM) Chain Size -No 14

₹217
amazon
Updated 3614h ago
RvPaws Heavy Duty Vinly Coated Tie-Out Cable/Leash for Dogs up to 60 LBS, 15 Feet - Blue Color
Rvpaws

RvPaws Heavy Duty Vinly Coated Tie-Out Cable/Leash for Dogs up to 60 LBS, 15 Feet - Blue Color

₹349
amazon
Updated 3614h ago
Woofy Heavy Duty Dog Leash,Metal Dog Leash Dog Chain with Handle for Small & Medium Large Size Dogs (Medium)
Woofy

Woofy Heavy Duty Dog Leash,Metal Dog Leash Dog Chain with Handle for Small & Medium Large Size Dogs (Medium)

₹279
amazon
Updated 3614h ago
W9 Pet Products Pack of 2 Puppy Collar and Leash Set-Reflected Tape Nylon Leash with Camo Print Leash for Small Puppy-1.5 CM x 120 CM (Black-Green)
W9 Pet Products

W9 Pet Products Pack of 2 Puppy Collar and Leash Set-Reflected Tape Nylon Leash with Camo Print Leash for Small Puppy-1.5 CM x 120 CM (Black-Green)

₹299
amazon
Updated 3614h ago
Active Pets Heavy Duty Nylon Dog Leash | 3M Highly Reflective Dog Rope Leash | Soft Padded Handly Dog Belt for Medium Large Dogs Walking Running Leash (Black)
REVATAKG

Active Pets Heavy Duty Nylon Dog Leash | 3M Highly Reflective Dog Rope Leash | Soft Padded Handly Dog Belt for Medium Large Dogs Walking Running Leash (Black)

₹399
amazon
Updated 3614h ago
PetVogue Small Dog Leash 4Ft Nylon Rope Cord Training Pet Walking Leashes For Small Sized Pet Reflective, Anti-Slip Padded Handle Leash For Dogs, Cats-Blue,15 cm
PetVogue

PetVogue Small Dog Leash 4Ft Nylon Rope Cord Training Pet Walking Leashes For Small Sized Pet Reflective, Anti-Slip Padded Handle Leash For Dogs, Cats-Blue,15 cm

₹375
amazon
Updated 3614h ago
Nema Pet Outdoor Harness Flexible Retractable Leash - Red
Nema

Nema Pet Outdoor Harness Flexible Retractable Leash - Red

₹506
amazon
Updated 3614h ago
Metal Chain Leash for Small Dog (14)
0% OFF
AKOSHA

Metal Chain Leash for Small Dog (14)

₹249
₹250
amazon
Updated 3614h ago
PSK PET MART Ghungroo Dog Combo Pack of Harness, Neck Collar Belt and Rope Set (Black, Medium) (Red Ghungroo)
Sip

PSK PET MART Ghungroo Dog Combo Pack of Harness, Neck Collar Belt and Rope Set (Black, Medium) (Red Ghungroo)

₹229
amazon
Updated 3614h ago
MUNCHOS Rope for Medium Dog (152Cm X 12Mm)
WAGGY TAILS

MUNCHOS Rope for Medium Dog (152Cm X 12Mm)

₹300
amazon
Updated 3614h ago
KUTKUT Retractable Dog Leash, 360° Tangle-Free Pet Leash, Anti-Slip Handle One-Handed Brake/Pause/Lock 5 Meter Nylon Retractable Dog Leashes for Small Dogs and Medium Dogs (Blue, 16ft)
KUTKUT

KUTKUT Retractable Dog Leash, 360° Tangle-Free Pet Leash, Anti-Slip Handle One-Handed Brake/Pause/Lock 5 Meter Nylon Retractable Dog Leashes for Small Dogs and Medium Dogs (Blue, 16ft)

₹1,088
amazon
Updated 3614h ago
Black Braided Dog Leash 12mm length-152cm(5ft)
Rexalt

Black Braided Dog Leash 12mm length-152cm(5ft)

₹180
amazon
Updated 3614h ago
PSK PET MART Dog Show Leash, Nylon, 5 Feet, Red
BLAKITO

PSK PET MART Dog Show Leash, Nylon, 5 Feet, Red

₹166
amazon
Updated 3614h ago
PSK PET MART Chock Chain 24 inches Neck Chain for Small and Medium Dog Dog (Silver)
CIBO

PSK PET MART Chock Chain 24 inches Neck Chain for Small and Medium Dog Dog (Silver)

₹269
amazon
Updated 3614h ago
Heavy-Duty Traffic Dog Leash with Double Handle (1 Meter) | Reflective Rope for Night Safety | Strong Training & Walking Lead for Medium & Large Dogs (Black)
Canophilia

Heavy-Duty Traffic Dog Leash with Double Handle (1 Meter) | Reflective Rope for Night Safety | Strong Training & Walking Lead for Medium & Large Dogs (Black)

₹550
amazon
Updated 3614h ago
PETS EMPIRE Classic Dog Collar & Leash Set with Bow – Elegant Adjustable Collar[2.5*(46-55) cm] & Leash(2.5 * 150cm) for Large Dog Breed (Large, Red)
0% OFF
Bow! Wow !!

PETS EMPIRE Classic Dog Collar & Leash Set with Bow – Elegant Adjustable Collar[2.5*(46-55) cm] & Leash(2.5 * 150cm) for Large Dog Breed (Large, Red)

₹293
₹294
amazon
Updated 3615h ago
Jainsons Pet Products Dog Collar and Leash Set, Nylon Pet Leash with Matching Adjustable Collar for Small Medium and Large Dogs, Leash and Collar for Dog Puppy Cat (12 mm Leash Collar)
Jainsons Pet Products

Jainsons Pet Products Dog Collar and Leash Set, Nylon Pet Leash with Matching Adjustable Collar for Small Medium and Large Dogs, Leash and Collar for Dog Puppy Cat (12 mm Leash Collar)

₹165
amazon
Updated 3615h ago
BNF® 2X Reflective Dog Leashes Dog Training Leashes for Medium Large Dogs Running Pink 120CM|Pet Supplies | Dog Supplies | Leashes & Head Collars|2 Dog Leashes
55% OFF
Deal 95
Pet Guard

BNF® 2X Reflective Dog Leashes Dog Training Leashes for Medium Large Dogs Running Pink 120CM|Pet Supplies | Dog Supplies | Leashes & Head Collars|2 Dog Leashes

₹1,001
₹2,203
amazon
Updated 3615h ago
Nylon Dog Training Lead Dog Leash Long Leash 10 Ft Long Leash for Dogs (1" Inch Wide) (Black, 10 FT)
MS PET HOUSE

Nylon Dog Training Lead Dog Leash Long Leash 10 Ft Long Leash for Dogs (1" Inch Wide) (Black, 10 FT)

₹250
amazon
Updated 3615h ago